Event 1
Saturday, November 6
The day we go to a BOAT BUILDING WORKSHOP
Time to Build: 5 hours
Hours spent enjoying the event: Endless
This is when it all began, we took this group photo.
We began work, both Mr. Morissette and I overlooked the entirety of the materials in this image.
We all took a gander at the manuel for further instructions, mainly to start the project.
At this point, we just made sure our boat was at an exact measurement.
I was the “clamp” used whenever someone drilled, so they called me “The Human Clamp”
Derek is measuring thoroughly in this image, making sure all is perfect.
Nathan measures to exacts as I place our card in front of him for a photo.
I walk by a ton, so I got snapped with the boat and the others working and cleaning up.
The boat, missing some nails of course.
All of us together with the boat.
As we picked it up, we struck a pose.
We took the boat back to HTHNC, for it needed sanding, poxying, and a paint job. Tiring Saturday, started at 5am for me, ended at 10pm all in all, much fun.
